Showing posts with label socks. Show all posts
Showing posts with label socks. Show all posts

Saturday, February 7, 2015

Third Times the Charm

Thursday afternoon - I finally got my two sweater sleeves to match! The picture shows the point where the sleeves didn't match on the first two attempts. If I had looked more carefully, the sleeve would be finished now. Better that it's correct. I'd regret it every time I wore the sweater! Also, I probably wouldn't wear it as often as I hope to.


Friday morning - The second sleeve is finished and it matches the first!!! One is still wet. I'm so relieved to finally finish it.


It seems like I've been knitting this sweater forever! I did start recycling version #1 in February, so it's been a year, but I didn't work on it the whole time. I needed to put the yarn into hanks and wash it. Actual knitting started mid November, with time out for Christmas present construction. I've got patter notes for the fronts (it's a cardigan). The fronts are smaller than the pieces I have finished. There is hope that I can wear it before the weather gets warm.


Almost there! I've got all the pattern knit on my second sock, with just a little ribbing to do before toe decreases. I should finish that tomorrow.


Thursday, February 5, 2015

Yes, We Have Snow




It almost buried the bird bath.


It blanketed the bench. We have bright sunshine, but it's still hard to get around!

Knitting
I spent Sunday knitting a hat. It was slow going because the lilac yarn is mostly cotton and not elastic. It does make a cute thick hat!



The sweater sleeve doesn't show much progress. I thought that I needed to knit 18 more rows to the under arm. Did that and a little more. The cables didn't match sleeve #1. Retreated and started 2 rows later. Wrong! This morning I took another look at sleeve #1, and started the underarm 4 rows earlier, 16 rows from last posting. I could have finished it by now if I'd had my head together. It looks right now.



Sock the second nears completion.



Saturday, January 24, 2015

Knitting Fumes

It started before Christmas. I "needed" a needle to knit the cowl/neck warmers. I went to Knit Picks and ordered one of their pretty green wood needles in a 16" length. I also am always on the lookout for solid color non-shrink sock yarn.  I bought enough for 5 pairs. That should last me for a while!

Then my LYS got in a new line of guess what, non-shrink solid color sock yarn. 5 1/2 pairs worth joined the sock yarn stash. The library knitting group had a yarn swap/party.  Some partial balls joined the stash. I'll use them for color work socks. That's what the extra ball from the yarn store became. I agreed to design a mystery sock for a Ravelry group. I needed yarns with a good contrast. Back to the yarn store for 2 more balls.

On New Years Eve, I got am e-mail about a sock yarn sale at WEBS. 10 pairs worth, trying to concentrate on lighter colors. 

Then to top it off, my guild had its annual yarn swap/sale. Yarn for 12 more pairs followed me home. 


This is where the recent purchases live. The top shelf is the 50 gm bits that will show up in color work socks later. Some of it is leftover from other socks.

Meanwhile I keep knitting on my Fledermaus socks. 


I'm now nearing the toe. The patterning is going slowly, complicated by the fact that I'm knitting other things too. I finished the cowl/neck warmer for my grandson's birthday.


I've started a commission sweater. It's a simple pattern that I can take with me. The socks can only go to a limited number of situations, due to their complexity. The same for the grey sweater that I work on every morning. 

Weather continues to frustrate my dog walking, so I have more knitting time. We have started walking in a cemetery. The roads are clear, the traffic light, and it's not near enough to our house that she thinks she's allowed in the road. Walking the neighborhood twice a day will commence when the sidewalks are ice free.



Tuesday, January 13, 2015

The Library Challenge

Thanks to Ravelry I have joined The Library Challenge.The idea is to use that pile of books and patterns that you have collected over the years, using at least one pattern per month. I'm doing well this month.

Erin's Elephant is from Knitted Wild Animals. She'll be getting that on Thursday January 15.
I have a gift for my daughter in law, where I used my Best of Lopi book. No photos yet, she reads the blog.
The Socks I'm knitting came from a free pattern that was in my Ravelry library.


I'm reknitting a sweater that I designed in 1999. That one's from my personal library. I have a lot done on the first sleeve.The photo story is on Ravelry.



My charity knitting continues. Socks for Wool-Aid, a pair nears completion. Mittens for our knitting guild. Other knitting this month: a neck warmer for a grandson with a Feb.1 birthday, a mystery sock design for a Ravelry group to be released in July/August.

I have a basket of yarn to be used this year, some new, some very old. I'll add to it as I knit up projects.



I'm getting more knitting done these days. The weather is not safe for me to walk the dog, so that time is being put to knitting.

Saturday, November 15, 2014

Winter is here for now

I woke up yesterday to this
The dog and I trudged through 4" of snow. (I didn't realize there was that much). It was fresh and not to hard to walk through.  Today, there is more snow and we're not walking.
It sure is pretty though.

Christmas knitting continues though, another cowl is almost finished. 😊 I'll start some socks later. I have the Volteado pattern from Knitty loaded into Knit Companion on my IPad. 

I seem to have lost a post. It had the first cowl and a pair of socks. The cowl was based on a free pattern that I altered to fit my gauge. The yarn is nice and durable Red Heart.

I also finished a pair of gift socks recently. The yarn is Grundl Hot Socks, another durable yarn. I make most gift socks from indestructible yarn. The yarn left from these socks will go into the new pair.
 



Sunday, May 25, 2014

Wet Wool

Hanging in my basement. Clean wool that used to be a big warm comfy sweater. Too big!! I unraveled the sweater during the Olympics. It took a while to make all the hanks, so I could wash it. Some of them are a bit tangled, and will have to be wound by hand into balls again. I may rewind with the ball winder. I still need to rework the pattern, but I'm not ready to start knitting yet. There are a few clean socks on the line too. As long as I was washing wool......
I've been working on a pair of socks for a birthday present. One sock is finished, but no photos until after the birthday.
I finally put some patterns up for sale on Ravelry. Reworked two patterns with new PDFs and put up a new sock pattern, McClay Gardens Socks. Tomorrow, I'll put them on Patternfish and send the socks to DD# 5 for inclusion in her online store.

It's a peaceful holiday weekend. The grass is mowed! I still have veggies and flowers to put in the ground, but the weather should be good for that..

Friday, March 14, 2014

Follow up

Yesterday, Blogger didn't want to upload pictures from my phone. I'm using more and more for knitting pictures.

Here is the skirt 

Here is how it fits. I love it! It's a combination of wool and acrylic, picked for color. The stitch is alternating seed stitch (k1, p1 then knit a round, p1, k1 then knit a round)

This is a hat and mitten set that I knit for the guild tree. So far I've made 2 hats and 5 pairs of mittens. I may need to take a break and knit mittens and hats for myself. My pink and purple mittens that match my coat keep getting holes. I have matching yarn and keep repairing them. Replacements are scheduled. I also need a hat and mittens for my green Borg coat if I'm going to wear it in the cold weather it is suitable for. Have yarn, must knit. In addition, I have a navy dress coat. The hat scarf and mittens are gone. I have a blue scarf that is suitable, but need hat and mittens. Have yarn, must knit. I need to do these for next winter.

In the mean time, I keep working on my green socks.
I'm having trouble with the heel. Operator error! At first I didn't have the heel centered. It's a heel construction I haven't done before, so I need to pay closer attention. I should have a heel by tonight.

The sweater will be finished by month end. I'm almost at the armhole of the second sleeve. Then on to the front bands, collar and zipper. This will go well with the skirt. The cuffs, front bands, and collar are reversible cables.


Thursday, March 13, 2014

Catch Up Again

I keep knitting and fighting the snow. Yesterday was one of those "wintery mix" days. It started with rain. The temperature fell. So did about 3" of snow. SPRING IN 6 DAYS!!

This year, my city has used less salt than other years, which makes the streets more challenging to drive on. They are plowed frequently, and my driveway is plowed up to 3 times a day, but really!

Olympic Knitting
I finished all my projects/events plus one extra.

The Lady Macbeth Sweater is on track to be finished by the end of the month. The body and 1 3/4 sleeve are finished. I hope to wear it to Knitter's Fantasy April 5.

The Sock Hockey event was finished. It was entered for Team sock Knitters Anonymous, and won a prize.I got a sock pattern and a skein of sock yarn.

The Aerial Unwind event was completed and I have started preparing the yarn for washing and rewinding into cakes.
The skirt is finished and I love it. That was a WIPs Dancing event. I started it in November.
I also knit a charity hat.


I've since finished two more pairs of mittens, another hat, and a pair of socks for charity.
I've given myself a Lenten meatless challenge. I'm trying new recipes and eating more fish. I made a tomato rice casserole, and have a spoon bread recipe I want to try. It's made with polenta, creamed corn and broccoli. I also have a few things in my freezer without meat. The rest can wait until after Easter.












Monday, February 10, 2014

Well That was Interesting!

I did run out of yarn for the socks, and finished with some black. After all the angst about size and yardage, I remembered that I had used the brown yarn to decorate another pair of socks. with I had put a note with the yarn. anyway they are done and will be given some time in December 2014, either birthday or Christmas.

It keeps on snowing here. I'm ready for spring!

My knitting guild has decided to decorate a Christmas tree for charity next year. They need about 200 hats and mittens, which will be donated after serving as ornaments. I knit a pair of mittens. It seems I can't count. The first mitten was knit on 40 sts. The second on 52. Since this was for charity and I had plenty of yarn, I knit another pair like this. I also finished a smaller pair.

While I was on a mitten kick, I knit two pairs for great grandkids.
I also sneaked in a pair of fingerless mitts for ME before starting my Olympic challenges.
This is a pattern that I designed a year or so ago. I used the same yarn for me, since I had given away the originals. They'll be ready when the weather decides to cooperate.

I'm working on four Olympic challenges. Early in the day I have my Lady Macbeth sweater. I may not finish this, but and hour or so a day makes progress. It would qualify for the Ravelry event WIP Dancing, but I won't enter it unless it is finished.

Secondly, I have a pair of socks: event Sock Hockey. It's a Cookie A pattern which will also qualify for SKA and Solid Socks, I'm working with Knit Companion, which is great for a pattern with a 38 row repeat. It's the socks shown on the cover of her Sock Innovation book. I've done 48 of 63 rows on the first leg.

Thirdly is my Aerial Unwind event. I'm reclaiming the yarn from my TKGA Masters sweater. Lovely yarn. A great sweater! Too big for the body I have now. I found the pattern and will reknit and publish the pattern after rewriting in a smaller size etc.

Fourth challenge is another WIP dancing event. I started a skirt from leftover yarn. This is a Gwen Bortner idea, which I am probably going to have finished by the end of the games. I'm using up lots of odd balls of worsted weight yarn.

I've recorded the games and plan to do a lot of sitting and knitting in the next two weeks.

Thursday, January 16, 2014

Third Time's the Charm

I've been knitting on a pair of brown socks and learning my new Knit Companion app for the iPad. I don't know which has been more frustrating.

I started the sock, which said "Cast on 72 sts" with 16 sts each on 4 needles. That does not equal 72, as I found out after doing the cuff. The leg pattern didn't fit the stitches on the needles. RRIIP!! I started again with 18 sts on each needle and the pattern worked.

As I got to the heel, I had to knit the heel flap twice. The second time I followed the pattern except for length. I shortened it to fit the target foot. The more I worked, the more it became obvious that the sock was too big and I was running out of yarn.

Started again with 16 sts per needle and revised the pattern to fit. I should have enough yarn to finish. I would have had to start over no matter what yarn I used, so I reused the same yarn.

I have Knit Companion tamed for the moment. I scanned the instructions out of a book and turned them into a pdf. This was saved in Dropbox, where it can easily be downloaded into the program. I cropped the charts as needed so that they are separate pieces. I then added smart counters that mark which row I'm on and how many times I need to repeat. A tap of the finger moves the marker up a row, and when I reach the op of the chart, it goes back to row 1. It even has a line marker where I switch needles in the middle of the chart.
I had a yellow line on row 1, that I was able to remove. I've figured out how to easily reset the counters after the sock reverted to a ball of yarn. The sock will go faster on fewer stitches.

Ideally, everything goes right the first time. At least I don't have an impending deadline for the socks.

Tuesday, May 21, 2013

The Month of Doctors Continues

As I said before I went into radio silence, I went to my primary care doctor for a routine check up. Everything is good. He told me how to find an audiologist, who tested my hearing. One ear needs help, which I knew. It's been bad ever since i can remember, but age has probably made it worse. The other ear is marginal, but close to normal. I need hearing aids!

When I got my eyes tested, I was told that it was time for cataract surgery. I was surprised, although I knew it was coming. Research done, questions asked, and surgery scheduled. The first eye will be done May 28. and the second about a week later.

My son found the name of a hearing aid lab which sells aids more cheaply by cutting out the middle man. I took the results of my test to him and could have walked out hearing better except that there was too much wax in my ears. I was sent home with an ear cleaning kit and went back a few days later to get hearing aids. The unit I got is small and fits behind my ear with a small tube that goes in the ear. They are set up by computer to give me exactly the help I need. Also they are small enough that I can still use my Bluetooth for my phone! I love hands free talking. I also can use the earphones I have for the gym. I'm still getting used to a more noisy world. My brain is starting to filter out unnecessary noise, like the ticking of the kitchen clock.

My knitting guild sponsored a weekend with Sally Melville. I was able to go on Friday night and all day Sunday. I learned a lot. I worked on the black sweater. It is on hold right now, because I am knitting a pair of socks for my son-in-law. His birthday was Sunday and the socks aren't done. I seem to have less knitting time these days. His home is in Florida, but he says he lives in his truck. I might see him again in July if he gets to the Cleveland area.as planned. He and my daughter were here in late April for a visit. Anyway, I won't see him for his birthday, and will send the socks on as soon as they are finished, or save them for July when they come here.

I did finish the shrug. It's a little big, but I think that's all right. It's been too warm to wear it. I've also been knitting on my sock yarn sweater. That cut into sock knitting time too.

It's time to grandkids soccer/baseball games. I can knit during those. It's also time for yard work. Lawn mowing seems to take forever right now. the grass is long, thick and wetter than I would like. The mower wants to clog up. Years of the fertilizer man result in a lawn that looks great, but the thick, vigorous growing grass is a problem right now. I haven't eve n started on the weeds!

Today is tooth cleaning, so the body maintenance continues. I'll stop typing and go schedule my mammogram. That's the last thing that needs to be done for now. By early July when I can get a new glasses prescription, I'll be a new woman. I may only need reading glasses, but we'll see.

Monday, March 25, 2013

Sometimes I Hate Technology!

The hard drive died on my pc! It is in the hospital getting a brain transplant. We hope to retrieve data and reload. Not everything was backed up, but the most important stuff should be. The fix-it guys talked about backing up and retrieving things I hadn't thought about. Wish me luck! I hope to be back in business in a few days, although I'll be reloading lots of programs so I can retrieve the data.

Update - I'm back in business! Still have lots of programs to update. My email has problems. My scanner and printer aren't talking to the computer. My son will be here tomorrow to try to fix.

What have I knit? I finished the socks. They're called Mad Hatter, and are a pattern I sold to a sock club. When the pattern came out, I was given the whole month's package. It took me a while to knit them up.

Another kit that went on vacation with me was a baby sweater. I was given the kit as a door prize when I taught for the Roof Garden{?}Knitting guild in New York near the 9/11 plane crash site. The pattern is a Kristin Nicholas design done in cotton yarn. I don't have a bay in mind, but I'm glad to have the kit done, and babies get born all the time. I'll be ready the next time someone holds a shower with little notice.

The last project that went to Florida and came home unknit is a scarf from Knitty.com called Caireen.. I happened to have the correct Alpaca yarn, won as a door prize again, this time from Knitter's Fantasy held in Youngstown Ohio.The yarn is local, but I don't remember who it came from. It's handspun and sure is soft!

I have more knitting to show you, but I'll save it for another day.

I am so glad to have my computer back. I took it back to the store where I bought it. They were able to save all my data, but not the programs. Luckily what I use most is Microsoft Office. I got the computer back with a limited usage version of it (19 times). I have the disks for the 2007 version and on the second try was able to successfully enter the product key. Why do they write them so small? The "B" looked like an "8". I've downloaded iTunes and Blogger.

How did I survive a week without my baby? I get mail on my iPhone and iPad. I could read blogs and Ravelry. I was lucky it only took a week. Actually, I "stalked" the store. I called when I thought the work would be done, only to find out that it hadn't been started. The phone call bumped me up in line. A second call three days later was more encouraging. I'm having to relearn how to type. Autospell on the phone has spoiled me. You don't have to put in apostrophes, or even spell correctly. It will autocorrect. If you're not careful, it may say something you didn't mean, but generally it's a help, especially on the smaller phone screen.

Monday, January 21, 2013

Sock Woes and other things

The Zinnias socks are finished, photographed, and have been mailed to Illinois. the pattern is written and up in my Ravelry store. Just need to do Pattrnfish.

The main color is Regia Jacquard and the flowers are Schaeffer Anne yarns. The iPad shown in the last blog post has been returned to my daughter. She loaned it to me, because she wanted to be sure that I would use it before I spent the money.

I got some money int he mail that paid for more than half the cost, so I went out and bought my own. I had heard about used iPads, but none were available. Mine is verison 2 with no phone card. It doesn't make sense to pay for another data plan that I wouldn't use much. The wifi connection is fine.

So far I have put knitting patterns, books and recipes on my Pad. I'm leaving for Florida in a week, so portable books will be handy.

Sock woes
Periodically, some socks that I have knit come home for repair. DSIL sent these with his wife on her last trip to Cleveland,

I had used a small patch on a previous pair and they then wore out at the edges of the patch. Size 14 socks which are otherwise in good shape get new toes, and the first pair did. I'm trying a big patch this time. I still can replace the toes.

Another sorry pair of socks has been in my house for a few years. I misplaced one sock, didn't find it until the house renovation last year. It's time to get these fixed.

When I made them, I ran out of yarn before the toes. I guess the stitch pattern was yarn hungry. The light colored spots are worn very thin. DD wore through the ball of the foot and the toe. I cut off the damage, picked up stitches and knit new toes. They look much the same as the old ones, but this time they are Patons Kroy, I think the rest of the sock is Regia Jacquard. They both wear forever.

I've been working on this sweater. I got the body finished and most of one sleeve before trying it on. I went back and forth,but finally decided that it really was too small. My yarn is a thinner version of worsted. It's Berroco Cotton Twist.

I now am nearing the end of the lace on the body. I'm also using all 5 buttons left from the original garment. I'm hoping to wear the sweater to Florida. It's going with me finished or not!

Saturday, December 29, 2012

Seasonal thoughts

Is this an air guitar, or a ghost one? Seen in the window of a local guitar shop, while walking the dog.

Actually, it's plastic. I really like the photo.

It's winter here in NE Ohio. I had dinner with my son on Christmas Eve and the went to Midnight Mass. Cold, but no snow, except a little left over, mostly on the grass.

Christmas morning was quiet. The family planned to get together Wednesday evening. Santa snuck in while I was out and filled my stocking. It seems my daughters think I should have something to open Christmas morning. I got candy. cookie mix and other little things. My dog got a huge rawhide bone that she hasn't started chewing yet.

A blizzard was predicted, resulting in a parking ban where my son lives. He was the host for the family Christmas. WEe held it Friday night. I made quilts from fleece and flannel that were a big hit. The smaller boy has dinosaurs on his quilt (a big interest).
I got more food stuff, flavored coffee, box mixes for baking, more candy, and the loan of an iPad. I want to buy one, but DD wants to make sure I'll use it before spending the money. She has one that she's not using much at the moment, since her phone does a lot of what she wants. I was looking for a bigger screen that a phone has. I expect to download things for use, but not store them on the iPad

Knitting has happened. I tore out my sweater. It was too small. I've started again, but concentrated on finishing a pair of socks needed by year end for a Ravelry group. The pattern is written, but I need better light for a good photo. What I'm using is acceptable, but I want a better photo as part of the pattern.

I also can show the mystery sock now that all the clues are out. I called it Winter Berries. I was thinking of mistletoe, but there were too many projects with that name. Right now, it's a free pattern, but eventually I'll reformat it and sell it.

I'm enjoying my time off from work, catching up on household things and cooking a little. I have a tendency to cook instead of clean, but I'm fighting it. There's only one of me and I can fill the freezer faster than I can empty it. I have a rule that I can't cook  a main dish if I don't have enough plastic boxes to pack up the left overs. I could buy more boxes, but have decided not to. These work well for taking lunch to work. I often full them with salad. They hold about 3 cups.

Today I made Oxtail Stew in my Crock Pot. It cooked all day until the meat fell off the bones. I used a recipe from Joy of Cooking and it is supposed to be served over noodles. Tonight I microwaved a couple of small potatoes and put stew over them.The white in the photo is reflection from the overhead lights

Time to let the dog out one last time, pack up the stew, and head to bed.

Tuesday, December 18, 2012

My Dog is on Vacation

She doesn't know it, but she's avoiding the waterproofing men and the noise and disruption going on this week. Monday I went to work after dropping her at the kennel. I avoided a day of jack hammering to dig up the floor around the basement walls.Today there is piping in the trench. The white is a waterproof coating for the inside walls.

This is the new sump pump. The picture shows the original "flower pot" walls which are over 90 years old and the original water proofing has failed. The blocks are made of clay similar to a flower pot and were originally sealed on the outside. The copper pipe is the cold water return to the boiler.


On the outside wall, the sump pump looks like this, with the downspout from the roof on the left.


The outside walls now have piping like this. The walls were covered with tar and plastic, which forms a trough in which the pipe is laid. The pipe connects to the downspout drain. This is where work has stopped for now.

The back yard is a storage area. Buckets were used
as a bucket brigade for removing broken concrete from the floor. I hear it weighed about 2 tons. They
are also used to bring gravel into the house to fill part of the trenches. So far only the sump pump has gravel around it.


 Everything in the basement was disrupted. I can't wash or dry clothes until this is over. It even disrupted my kitchen, because they unscrewed a small breaker box from the wall and shut it off.to do that No light over the sink, no dishwasher, no disposal. I fixed that for now, by turning on the breaker.

Dear grandson Vitor is home from college. He's now 20 years old and we celebrated his birthday. Of course, I knit him more socks. My Mystery Sock patter is doing well on Ravelry, with over 500 people downloading it so far. The only problem was a bad symbol definition. I had found the error, but not put the corrected version into the pattern. All is fixed now. I had anticipated more problems, because of the unusual stitches I used. So far, so good. 

I ended the day by cooking some Poblano Chicken Chowder. I failed to correctly read the instructions and only added 3 cups of chicken broth instead of 3 quarts! A trip to the grocery store was made and it now looks like soup. I thought that chowder contained potatoes, but this one doesn't.