Showing posts with label sewing rescues. Show all posts
Showing posts with label sewing rescues. Show all posts

Thursday, October 15, 2009

It's definely Fall

The leaves are changing and falling, as well as the acorns falling, although they've slowed down. The neglected garden has a few interesting plants, not what I chose, but interesting.

The soup pot is in use again. Today I made one of my favorites Pumpkin soup by LynnH. Pumpkin, applesauce and peanut butter. Quick and yummy.

Speaking of interesting, a customer called my dressmaking shop and asked if i could shrink a dress for her sister. It seems the sister had undergone weight loss surgery, loved the dress and couldn't wear it any more.

There's always a problem when shrinking dresses because you can't shrink the neckline. This dress was basically strapless, with a halter tie at the neck. The bodice was pieced and darted strangely, but I had enough fabric to work with and the design lent itself to downsizing.

I keep forgetting that I have an old camera at work, so no before picture. I removed the bodice from the skirt and took out 12 inches, some on either side of the front ruffle and the rest at the sides and back. The ruffle piece was kept ans is and regathered to fit the new size. Four inches were removed from the waist (she must still have a tummy).The skirt was shortened 4 inches from the top, so I had to move the pockets. I hope it fits, but it matches the measurements I was given.

I made some purple socks for granddaughter AE. She's a short adult with a size 2 shoe. She loves the socks. I love them too and want to sell the pattern, so only a sneak peek.


The white vest is quite old (1996), but I love it and wear it often. I designed it and dug it our of my archives to put for sale on Ravelry. A web site where I can sell patterns is still on my to do list. I called it ZigZag Vest. It knit from worsted weight cotton. I needed new photos for the pattern.

There are more grandchildren socks in the works. Black socks for a July birthday grandson. I sent an IOU in his card.

I also have a pair for a granddaughter with an Oct. birthday. I'll see her Nov. 1, so not much time. Knit faster! I dream about quitting work, but I own the business and I'd have to bring too much stuff home. I have no place here to put it right now. Guess I'll keep juggling sewing and knitting for a while longer.

Friday, August 7, 2009

It's Rescue the Garment Week

Last post I wrote about my black linen jacket ease problem. It's been a week of "rescue this garment". Upsize a bridesmaid dress by 6" in the bust. I used fabric from the hem. Each inserted piece had a seam in the middle. Now it fits! The customer is happy! I still need to finish the hem and shorten the straps a little.

A bride and her mom brought in a Hong Kong Cheongsam dress started by bride's sister. Sister has left town and the dress has a few problems besides finishing. This is a Folkwear pattern. It was sloppily sewn and made to fit with 2" seams. I disassembled the dress and recut the front piece, using the original front and making it a size smaller. The back will take new fabric. The neckline was cut too big and uneven. Bride is buying more fabric for delivery tomorrow.

The front piece now has darts that are evenly spaced and bias trim on the top edge. The first trim is cut 1" wide, pressed with a fold, and applied with the fold on the seam line. The trim is opened, sewn on the fold line, and folded again toward the edge of the fabric. The second bias strip is cut 2" wide, folded in half, and sewn with the edges even with trim #1. This sewing is 1/16" closer to the edge of the garment. Seams are trimmed near the stitching and trim #2 is hand stitched to the back, covering all raw edges. No pictures today, but I have more trim to sew in the next day or so.

Today I got to rescue a bridesmaid. She's 6 mo pregnant and lives elsewhere. Mom made her a dress to wear to a wedding tomorrow. The top of the dress is tooooo small. 6" too small. At least there was fabric left from the construction. Two hours later, the dress zips. It isn't perfect, but her sister c ould see where I had added the pieces.

My knitting guild had a picnic on Sunday. Weather was iffy and attendance was low, but we had a good time. I could show pictures of people eating and stuff, but I won't. Nora was spinning lace weight cashmere. She started indoors before lunch. The deck had some nice shade, but wasn't very warm this day. Work moved poolside. No One went swimming this day. It's a great location, a house and pool on about 5 acres, owned by one of our members.

I worked on a stealth project for Christmas and got a lot done. This is a project that I work on every day off. Socks are my take along project for most occasions. I started knitting a pair for each birthday. I'm now a little behind, becuase of lots of July birthdays. There are no sock birthdays in August and I have one September pair done. Wish me luck and fast knitting.